BuildersCount

Concrete Calculator

Find how many cubic metres or bags of concrete you need, and what it will cost.

Made by BuildersCount · Last checked 3 Oct 2026 · Our sources

Measure your project

Slab
Base, patio, path or floor
How thick is the slab?
Extra for spills

We add 10%, as Sakrete, a US bag maker, suggests. We found no UK figure.

Your answer

You need about
0.99m³

That is about 35 wheelbarrow loads. We added 10% extra.

If you buy bags

99
bags of 20 kg
1,980 kg in total

One 20 kg bag makes about 0.01 m³, says Blue Circle. So about 100 bags make 1 m³.

If you order a lorry (ready-mix)

Ask for 1.00 m³. One supplier's smallest order for homes is 1 m³, so we price at least that.

This answer is a guide. For footings, drives or anything that holds weight, check your local building rules or ask a builder or engineer.

Which costs less?

Bags
£1,089
99 × 20 kg
Lorry
£128
1.00 m³
A lorry costs £961 less

You also skip mixing 99 bags by hand. Have the edges ready before it comes.

UK middle prices from October 2026, with 20% VAT. Ask your supplier for their price.

Quick answers

A 3 × 3 m slab, 100 mm thick
0.9 m³. With 10% extra, 0.99 m³, or 99 bags of 20 kg.
Bags in 1 m³
About 100 bags of 20 kg. Each bag makes about 0.01 m³.
How thick?
At least 100 mm for a house floor. A trade guide says 100 mm for a car drive, and 150–200 mm for heavier use.
Ready-mix price
About £128 per m³ with VAT. That is the middle of 7 prices from 4 UK suppliers.

How to work it out

  1. Measure the length and width in metres.
  2. Measure the thickness in mm. Divide by 1,000 to get metres.
  3. Multiply length × width × thickness. This gives m³.
  4. Add 10% extra.
  5. For 20 kg bags, divide the m³ by 0.01. Round up.

3 × 3 × 0.1 = 0.9 m³
0.9 + 10% = 0.99 m³
0.99 ÷ 0.01 = 99 → 99 bags

Bags or a ready-mix lorry?

A 20 kg bag is easy to carry and mix. Per m³, though, bags cost far more. You need about 100 bags of 20 kg for 1 m³. At £11 a bag, that is about £1,100.

Ready-mix costs about £128 per m³, with VAT. So bags cost about 9 times as much. Our bag price is the middle of 4 prices from only 3 stores.

Small loads

Ready-mix comes in a mixer lorry. A full lorry holds 7–8 m³, says Heidelberg Materials. Less than that is a part load. Suppliers treat part loads in different ways:

  • Rock Solid Concrete takes orders from 1 m³ for homes.
  • EasyMix says it has no part-load charges. It does charge for delivery.
  • Heidelberg charges for part loads, but does not list the amount.
  • Mister Concrete has a minimum charge of £625 plus VAT. That is £750 with VAT.

Check the minimum charge first. At £750 with VAT, it would buy about 68 bags, or 0.68 m³. Without such a charge, 1 m³ of ready-mix costs less once you need 12 bags.

Checkatrade, a cost guide, puts delivery at £100–£200 and a minimum order at £500. Some prices include delivery and some don't. Add any delivery fee in "Change prices".

Think about moving it, too. 1 m³ is about 35 wheelbarrow loads, says Heidelberg.

Concrete for fence posts

Blue Circle's Postcrete data sheet says how many 20 kg bags fill each hole.

Postcrete bags per hole
Hole (wide × deep)PostBags of 20 kg
15 × 60 cm5 cm round post½
20 × 60 cm5 cm round post1
25 × 75 cm10 cm square post1⅔
30 × 75 cm5 cm round post2¾

A 20 kg bag of post mix costs about £7.50. That is from only 2 UK stores, so check your own.

For other hole sizes, pick "Round holes" in the calculator. It counts ordinary 20 kg concrete bags.

How thick should it be?

  • House floor: at least 100 mm, says Approved Document C, the building rules for England. NHBC also asks for at least 100 mm. The hardcore under it should be no more than 600 mm deep.
  • Garage floor: at least 100 mm on 100 mm of hardcore, says NHBC.
  • Car drive: 100 mm. Use 150–200 mm for heavier use, such as large vans. These come from Pavingexpert, a trade website. We found no official UK figure for drives.
  • Patio slabs: a concrete bed of 50–80 mm. It sits on 50–80 mm of hardcore, says Cemex.
  • Shed base: we found no rule for how thick. See the mix below.

For a floor, drive or anything that holds weight, check your local building rules. Or ask a builder or engineer.

Which mix to ask for

Ready-mix suppliers sell mixes by name. Heidelberg Materials suggests these for home jobs. Cemex says what goes in each one.

Mixes for home jobs
MixUse it forCement : sand : stone25 kg cement bags per m³
ST2Foundations1:3:610.6
ST3Floor slab with a smooth top1:2:411.8
ST4Shed or garage base1:1.5:313.2

Cement from the British Standard table (BS 8500-2), as copied by Pavingexpert. For ST2 and ST3, Cemex gives 15–34% less.

For a drive, ask for PAV1. The Concrete Society says it is for house drives and domestic parking.

Mixing by hand? Heidelberg's cement data sheet says 1 part cement to 4 parts ballast. Our cement calculator works out the bags of cement and ballast.

Before you order

  1. Work out the m³, with about 10% extra.
  2. Ask for the price per m³, and if it includes VAT. Some price lists leave VAT out.
  3. Ask about part-load fees, delivery and any minimum charge.
  4. Ask how long the lorry can wait. Heidelberg gives 30 minutes to unload for free.
  5. Check the lorry can get close. If not, line up barrows and helpers.

Questions people ask

How much concrete do I need?

Multiply the length, width and thickness, all in metres. That gives m³. Add 10% extra. The calculator above does it for you.

How many bags of concrete make 1 m³?

About 100 bags of 20 kg. Blue Circle says one bag makes about 0.01 m³.

How much is a cubic metre of concrete?

About £128 from a ready-mix supplier, with VAT. That is the middle of 7 prices from 4 suppliers. In 20 kg bags, 1 m³ costs about £1,100.

Is it cheaper to use bags or ready-mix?

Per m³, ready-mix costs far less. But one supplier has a minimum charge of £750 with VAT. A cost guide puts delivery at £100–£200. So for a small job, bags can still win.

How many wheelbarrows of concrete are in a cubic metre?

About 35, says Heidelberg Materials. A full lorry of 7–8 m³ is about 245–280 barrow loads.

How much concrete do I need for a fence post?

Blue Circle's data sheet gives bags per hole. A 20 × 60 cm hole with a 5 cm round post takes 1 bag of Postcrete. A 25 × 75 cm hole with a 10 cm square post takes 1⅔.

How much does a cubic metre of concrete weigh?

About 2.4 tonnes, says Cemex.

What concrete mix do I need for a shed base?

Heidelberg Materials suggests ST4 for shed and garage bases. Cemex says ST4 is about 1:1.5:3 cement to sand to stone.

Where our numbers come from

Made by BuildersCount. Last checked 3 Oct 2026.