BuildersCount

Concrete Calculator

Find how many cubic metres or 25 kg bags of concrete you need in Ireland, and what it will cost.

Made by BuildersCount · Last checked 14 Oct 2026 · Our sources

Measure your project

I measure in
Slab
Base, patio, path or floor
How thick is the slab?
Extra for spills

Roadstone says add 5–10% for uneven ground and spills. We start at 10%.

Your answer

You need about
1.32m³

That is about 1.73 cubic yards. We added 10% extra.

If you buy bags

132
bags of 25 kg
3,300 kg in total

Kilsaran's data sheet: a 25 kg bag of its multi-purpose mix gives about 0.01 m³. A full m³ takes about 100. Kilsaran says to lay it 25–100 mm deep, so use ready-mix for thicker floors.

If you order a lorry (ready-mix)

Ask for 2.00 m³. We round up to the next 1 m³.

Hanly adds a small-order fee under 5 m³ but doesn't print it. Ask your supplier.

This answer is a guide. For a floor, drive or anything that holds weight, check your local building rules or ask a builder or engineer.

Which costs less?

Bags
€1,690
132 × 25 kg
Lorry
€286
2.00 m³ + any small-order fee (ask)
Delivery included from 5 m³
A lorry may cost less

Bags €1,690, lorry €286 before any small-order fee. The lorry costs less only if any small-order fee adds less than €1,404. Ask your supplier.

Prices from October 2026, one seller each. Ready-mix: Hanly Quarries, with 13.5% VAT. Bags: B&Q Ireland's shelf price, which we take to include 23% VAT.

Quick answers

A 4 × 3 m patio, 100 mm thick
1.2 m³. With 10% extra, 1.32 m³. That is 132 bags of 25 kg, or 2 m³ of ready-mix.
Bags in 1 m³
About 100 bags of 25 kg. Kilsaran says each bag makes about 0.01 m³.
Which grade?
C25/30 (30N) or stronger for floors and paths. C28/35 (35N) or stronger for drives and yards. Both from Kilsaran.
Ready-mix price
About €143 per m³ with VAT, at the one plant that prints a price. See our concrete price guide.
How much a concrete lorry holds
No Irish plant we found prints its lorry size. Hanly calls 5 m³ or more a full load. The smallest order is 1 m³.

How to work it out

  1. Measure the length and width in metres.
  2. Measure the thickness in mm. Divide by 1,000 to get metres.
  3. Multiply length × width × thickness. This gives cubic metres (m³).
  4. Add 10% extra for spills and uneven ground.
  5. For 25 kg bags, divide the m³ by 0.01 and round up. For ready-mix, round up to whole m³.

4 × 3 × 0.1 = 1.2 m³
1.2 + 10% = 1.32 m³
1.32 ÷ 0.01 = 132 bags
Ready-mix: 1.32 m³ → order 2 m³

How to measure and calculate concrete in metres

Here are common jobs, worked out with the formula in "How to work it out" above.

Concrete for common jobs
Jobm³ (+10%)25 kg bagsLorry order
Patio 4 × 3 m, 100 mm thick1.321322 m³
Patio 6 × 4 m, 100 mm thick2.642643 m³
Trench 10 m long, 600 mm wide, 250 mm deep1.651652 m³
6 post holes, 300 mm wide, 600 mm deep0.28281 m³

Sizes are examples, not advice. A lorry order is rounded up to whole m³, from 1 m³.

Not a rectangle? Split an L-shape into two parts. For a triangle with a square corner, halve one side. Round slabs, walls, tubes and steps are in "+ Add another part". Floors and shed bases: see our concrete slab calculator.

Bags, mix your own, or a ready-mix lorry?

Bags cost the most per m³, and a lorry the least. Mixing your own sits in between. Our concrete price per m³ guide compares all three, with VAT.

Kilsaran's own table gives up to 25% more per bag: 40 bags make about 0.5 m³. So our count may leave bags spare.

How much concrete does a lorry or truck hold in Ireland?

No Irish plant we found prints its lorry's capacity. What they do say is when a load counts as full:

  • Hanly calls 5 m³ (5 cubes) or more a full load, delivered. Below that, it adds a small-order fee.
  • Roadstone says a minimum load charge may apply under 6 m³.
  • Both take orders from 1 m³. Neither prints the fee, so we start it at €0. Type your quote in "Change prices".

Before pouring, check the truck can reach (see its dimensions below). For what a load weighs, see our concrete weight per m³ page.

Concrete mix: making your own with cement and batch gravel

Batch gravel comes in tonne bags with the sand already in it, says Kenny Fuels. You add cement and water.

Cement: for a small plain floor, TGD C allows 1 : 7 cement to aggregate, by volume. It asks for 200 kg of cement per m³ or more (8 bags). That is its weakest mix, 20N.

Kenny Fuels mixes 5 parts batch gravel to 1 of cement, which takes more. No Irish source says how much. For 30N, ask your merchant or order ready-mix.

Batch gravel: our rough estimate, as no Irish supplier gives one. Kilsaran's bagged concrete weighs at least 2,200 kg per m³ once set. We take a site mix as the same.

Take off the cement and up to 170 kg of water. About 1,830 kg is left: 2 tonne bags, or a bit more. Power Aggregates says some bags hold 800–850 kg.

Which grade: 30N or 35N concrete?

Builders say "30N" or "35N". Plants sell by C-class (I.S. EN 206). Roadstone's guide: 30N is C25/30, and 35N is C28/35.

  • House floor or path: C25/30 (30N) or stronger, says Kilsaran.
  • Drive or outside yard: C28/35 (35N) or stronger, usually brushed for grip (Kilsaran).
  • Shed base: no Irish maker names one grade. C25/30 (30N) is our safe pick, from Kilsaran's floor and path lines. Roadstone lists shed bases among its lean-mix uses.
  • Fence posts, kerb bedding: a lean mix, about C12/15 (Roadstone, Kilsaran).
N grades and C-classes
Ask forC-class
20NC16/20
25NC20/25
30NC25/30
35NC28/35
40NC32/40

From Roadstone's guide to I.S. EN 206.

Each grade's price per m³ is in our concrete price guide.

For a floor, foundation or drive, check your local building rules or ask a builder or engineer.

Before you ring a ready-mix plant

  1. Say which grade, such as 30N. Get a delivered price per m³ that includes 13.5% VAT.
  2. Give your Eircode. Roadstone prices by place, mix and load size.
  3. Check the lorry can reach: Roadstone's needs 3 m of width and 4 m of height.
  4. Be ready. On full loads, Roadstone gives the first hour free, then charges €15 per 15 minutes (VAT not stated).
  5. Don't add water on site. Hanly says that voids its strength promise.

Questions people ask

How much concrete do I need?

Work out the volume: length × width × thickness, with all three in metres. Roadstone suggests adding 5–10% for uneven ground and spills.

How much does one bag of concrete cover?

A 25 kg bag of Kilsaran multi-purpose concrete makes about 0.01 m³. At 100 mm thick, that covers about 0.1 m². So 10 bags cover 1 m².

What are the dimensions of a concrete truck?

Roadstone's truck is about 11 m long. It needs a way in at least 3 m wide and 4 m high. Check this before you order.

How much sand and gravel do I need for concrete?

Batch gravel already has the sand in it. For 1 m³, plan on about 2 tonne bags, our rough estimate. Add at least 8 bags of cement, more for a strong mix.

How many bags of cement are in a cubic metre of concrete?

At least 8 bags of 25 kg (200 kg). That is TGD C's least for a plain 20N floor. Stronger mixes need more. So one bag makes at most about 0.125 m³.

How many wheelbarrows of concrete are in a cubic metre?

We found no Irish figure. Heidelberg Materials in the UK says about 35 loads. That is about 29 litres each, so the barrow is only part-filled.

Can I work out concrete in feet or cubic yards?

Yes. Pick "Feet" in the calculator and it shows cubic yards. Irish suppliers sell by the m³, so order in m³. One cubic yard is about 0.765 m³.

Is the VAT on concrete 13.5% or 23%?

Revenue puts ready-mix at 13.5%. Bag prices show 23%. Our concrete price guide has more on VAT and the levy.

Where our numbers come from

Made by BuildersCount. Last checked 14 Oct 2026.

Cite this page

BuildersCount. (2026, October 14). Concrete Calculator. https://builderscount.com/ie/concrete-calculator/