Measure your project

Slab
Patio, path or floor
How thick is the slab?
Extra for spills

Sakrete, a bag maker, suggests about 10%.

Your answer

You need about
1.36cubic yards

That is 36.7 cubic feet. We added 10% extra.

If you buy bags

62
bags of 80 lb
4,960 lb in total
82
bags of 60 lb
4,920 lb in total
98
bags of 50 lb
4,900 lb in total
123
bags of 40 lb
4,920 lb in total

One 80 lb bag makes 0.6 cubic feet of concrete.

If you order a truck (ready-mix)

Ask for 1.50 cubic yards. We round up to the next quarter yard.

This answer is a guide. For footings, driveways or anything that holds weight, check your local building rules or ask a builder or engineer.

Which costs less?

Bags
$402
62 × 80 lb
Truck
$694
1.50 cubic yards
Bags cost $292 less

But you must mix 62 bags by hand. That is 2.5 tons. For a big job, a truck saves a lot of hard work.

Prices are US middle prices from October 2026. Ask your store for their price.

Quick answers

When does a truck cost less?
From about 3.2 cubic yards, if the plant charges a small-order fee for each yard short of a full truck. Many plants charge one fee per load instead, so ask your plant.
The formula
Take each measurement in feet, but the thickness in inches. Then cubic yards = length × width × thickness ÷ 12 ÷ 27.
How thick?
4 in for a private patio or path, or a car driveway. 5 in for heavier vehicles.
How much extra?
Add about 10%, so you don't run short. Sakrete suggests the same.

How to work it out

  1. Measure the length and width in feet.
  2. Measure how thick it will be in inches. Divide by 12 to get feet.
  3. Multiply length × width × thickness. This gives cubic feet.
  4. Add 10% extra. Then divide by 27 to get cubic yards.
  5. For 80 lb bags, divide the cubic feet by 0.6. Round up.

10 × 10 × 0.333 = 33.3 cubic feet
33.3 + 10% = 36.7 cubic feet
36.7 ÷ 27 = 1.36 cubic yards
36.7 ÷ 0.6 = 61.1 → 62 bags

Concrete for common slab sizes

This table shows how much concrete common slabs need. Each slab is 4 in thick, with 10% extra added.

Slabs 4 in thick, with 10% extra
Slab sizeCubic yards80 lb bags
4 × 4 ft0.2210
8 × 8 ft0.8740
10 × 10 ft1.3662
10 × 12 ft1.6374
12 × 12 ft1.9688
10 × 20 ft2.72123
12 × 20 ft3.26147
20 × 20 ft5.43245
24 × 24 ft7.82352

For a 5 in slab, you need about 25% more.

Need the stone base and wire mesh too? Our concrete slab calculator adds them.

Know the square footage already? At 4 in thick, one cubic yard covers about 81 sq ft. See square feet in a yard of concrete for other thicknesses.

Odd shape? Split it into boxes and add them up. A triangle is half a box. Measure its longest side and its height, multiply, then halve it.

Not a slab? Tap "+ Add another part" for a round slab, footing, post holes, wall, round tubes or steps. For more on each, use our footing, steps, tube form (Sonotube) or fence post calculator.

Bags or a truck?

Bags are good for small jobs. You mix them yourself, in a wheelbarrow or a rented mixer.

A truck brings concrete that is already mixed. This is called ready-mix. You pay for each cubic yard. Our middle price is $179 a cubic yard for a standard mix (3,000 psi). That is from 5 US sellers, before sales tax. Some of them add a delivery fee. Our concrete cost guide has bag and stronger-mix prices too.

Small orders cost more, because of a small-order fee. 2 cost guides we read put it at about $30–80 for each cubic yard short of a full truck. A full truck holds about 10 cubic yards (see how many yards in a truck of concrete). The calculator uses $50, the middle of these and a third guide we could not open.

Many plants charge one fee per load instead. In the plant price lists we read, a Nebraska plant charges $50 a load under 4 cubic yards. A California plant charges up to $100 a load under 3–6 cubic yards, by zone, plus delivery. A Hawaii plant has a $132–213 delivery minimum under 6 cubic yards.

With a small-order fee for each yard short, a truck starts to cost less from about 3.2 cubic yards. With one fee per load, a truck can cost less on smaller jobs. So ask your plant. Step 3 in the calculator checks your job, and you can change the fee there.

Think about the work too. The 10 × 10 ft slab in "How to work it out" takes about 2.5 tons of bags. You lift and mix all of that by hand.

How thick should the slab be?

At least 4 in for a private patio, a walk or a car driveway. Use 5 in or more for garbage trucks or other heavy vehicles. A house floor needs at least 3.5 in.

For garage floors, sheds and the gravel under each slab, see our concrete slab thickness guide.

Why bag counts don't agree

Online tools and forum answers can give different bag counts for the same slab. There are two main reasons.

  1. Bags make different amounts. A bigger bag makes more concrete. Check the size you will buy.
  2. Some counts add extra, and some don't. We add the extra you pick, and we show it.

You can't buy part of a bag, so we round up to whole bags.

How much concrete is in an 80 lb bag?

An 80 lb bag makes 0.6 cubic feet of concrete. This table shows 5 bag sizes, from Quikrete's data sheet.

What one bag makes
Bag sizeMakesBags per cubic yard
90 lb0.675 cubic feet40
80 lb0.6 cubic feet45
60 lb0.45 cubic feet60
50 lb0.375 cubic feet72
40 lb0.3 cubic feet90

Questions people ask

How much concrete do I need?

Measure each part. Work out the cubic feet. Add 10% extra. Divide by 27 for cubic yards. The calculator above does it all for you.

How do I estimate concrete yards?

Change the thickness from inches to feet first. Then multiply it by the length and width. Divide by 27, and add about 10%.

How do you measure how much concrete you need?

Measure the length and width in feet, and the thickness in inches. For an odd shape or more than one slab, add each part with "+ Add another part". The calculator adds them up.

Is it cheaper to buy bags or order a truck?

Our answer adds a small-order fee of about $50 for each yard short of a full truck. With that fee, a truck costs less from about 3.2 cubic yards. Many plants charge one fee per load instead. Then a truck can cost less on smaller jobs, so ask your plant.

How much more concrete does a thicker slab need?

A 5 in slab takes about 25% more concrete than a 4 in slab. County Ready Mix says it adds about 20% to the cost. On a 10 × 10 ft slab, each extra inch adds about 0.34 cubic yards, with 10% extra.

How much water for an 80 lb bag of concrete?

About 3 to 4.5 quarts. Quikrete says start with 6 pints (3 quarts), and Sakrete says 3.5 quarts. A 60 lb bag takes about 2 to 3.5 quarts.

Where our numbers come from

Made by BuildersCount. Last checked 15 Oct 2026.

Cite this page

BuildersCount. (2026, October 15). Concrete Calculator. https://builderscount.com/concrete-calculator/

Embed this calculator

Put this calculator on your own site. Copy this code into your page: