Cubic Yard Calculator

Work out cubic yards from metres, cm, feet or inches. Skips in the UK are sold by the cubic yard, so this helps you pick one.

Made by BuildersCount · Last checked 4 Oct 2026 · Our sources

Measure the space

Length and width are in
Depth is in

Your answer

That is
2.35cubic yards

1.80 m³ · 1,800 litres · 63.6 cubic feet

What it weighs

  • MOT Type 13.74 tonnes
  • Crusher run3.28 tonnes
  • Ballast2.97 tonnes
  • Gravel (20 mm)2.88 tonnes
  • Slate chippings2.88 tonnes
  • Sharp or building sand2.72 tonnes
  • Tarmac (laid)4.23 tonnes
  • Sand and cement screed, set and dry (Tarmac)3.78 tonnes
  • Topsoil1.44 tonnes
  • Bark0.45 tonnes

Tonnes for UK materials as laid, from bag sizes and cover. Wickes says wetness can change the weight of its ballast by about 5%.

Quick answers

1 cubic yard
27 cubic feet, or about 0.76 m³.
1 cubic metre
About 1.31 cubic yards.
Skip sizes
A mini skip is 2 yards (1.53 m³). A builder's skip is 6 yards (4.59 m³).
Skip weight
About 1 tonne per cubic yard, say two skip firms. Check with yours.
Dug soil
It takes 25–30% more room once dug. Clay or broken concrete can take up to 40% more.

How to work it out

  1. Measure the length, width and depth in metres. Change cm or mm to metres first.
  2. Multiply length × width × depth. That gives cubic metres (m³).
  3. Divide the m³ by 0.7646. That gives cubic yards.
  4. Measured in feet? Multiply the three sizes in feet, then divide by 27.

3 × 2 × 0.3 = 1.8 m³
1.8 ÷ 0.7646 = 2.35 cubic yards

UK skip sizes in cubic yards

Skip firms sell skips by the cubic yard. Two firms agree on these sizes. We worked out the m³ from the yards.

Common UK skip sizes
SkipYardsm³Bin bagsWeight
Mini2 yd1.53 m³about 16about 2 t
Midi4 yd3.06 m³about 33about 4 t
Builder's6 yd4.59 m³about 50about 6 t
8 yard8 yd6.12 m³about 60about 8 t
12 yard12 yd9.17 m³about 100light waste only

Mini, midi and builder's are L&S Waste's names. Bin bags from SunSkips. Weight: about 1 tonne per yard, from Sharp Skips and Able Skips.

These are guides, not limits by law. Each firm sets its own, so check before you book.

What size skip for soil or rubble?

Soil takes up more space once it is dug out. This is called bulking.

  • Ordinary soil: add about 25–30%, says a mini digger firm.
  • Clay: add up to 40%, say two UK firms. One says the same for broken concrete.

Soil and rubble are heavy. SunSkips says 8 yards is the biggest home skip for them. L&S Waste says don't fill even an 8 yard skip with only soil or rubble. Sharp Skips says heavy waste can go in bigger skips, so ask your firm.

How much ground fits in a skip
SkipHoldsSoil, as dugClay, as dug
2 yd1.53 m³1.18–1.22 m³1.09 m³
4 yd3.06 m³2.35–2.45 m³2.18 m³
6 yd4.59 m³3.53–3.67 m³3.28 m³
8 yd6.12 m³4.70–4.89 m³4.37 m³

Soil allows 25–30% growth; clay 40%. Filled level with the sides.

Our example hole is 3 × 2 m and 300 mm deep: 1.8 m³. With 30% more, it needs 2.34 m³, or 3.1 cubic yards. A 4 yard skip holds 3.06 m³, so it fits.

Skip rules to know

  • Fill it level. Merton Council's licence rules say soil and rubble must not go above the metal sides. SunSkips says to fill only to the full line on the side.
  • Mind the weight. Sharp Skips warns that firms charge extra if a skip is too heavy. Ask for your firm's limit.
  • Skips on the road. A skip on a public road needs a council licence. Brighton and Hove Council can take the licence back if the rules are broken.

The yards on a skip are its level size. You can't heap it, so the table shows all it can take.

Cubic yards, cubic metres and cubic feet

Each side of a cubic yard is 3 feet long. So it holds 3 × 3 × 3 = 27 cubic feet. These sizes are fixed, so the figures don't change.

1 cubic yard in other units
UnitIn 1 cubic yardOne of them is
Cubic metres (m³)0.76461.308 cubic yards
Cubic feet270.037 cubic yards
Litres7650.00131 cubic yards

From square metres to cubic yards

Multiply the m² by the depth in metres, then divide by 0.7646. For 20 m² at 50 mm deep: 20 × 0.05 = 1 m³. That is 1.31 cubic yards.

What a cubic yard weighs

Soil, stone and sand are sold in the UK by the tonne or bulk bag. This table turns a cubic yard into tonnes.

Weight of 1 cubic yard, UK materials
MaterialTonnesCubic yards per tonne
Tarmac (laid)1.80 t0.56
Sand and cement screed, set and dry (Tarmac)1.61 t0.62
MOT Type 11.59 t0.63
Crusher run1.39 t0.72
Ballast1.26 t0.79
Gravel (20 mm)1.22 t0.82
Slate chippings1.22 t0.82
Sharp or building sand1.15 t0.87
Topsoil0.61 t1.63
Bark0.19 t5.23

From UK bag weights and cover, as laid. Topsoil and bark come from a 500 litre bag.

So a cubic yard of topsoil weighs about 0.61 tonnes. A cubic yard of Type 1 weighs about 1.59 tonnes.

Questions people ask

How do you calculate cubic yards?

Multiply length × width × depth in metres to get m³. Then divide by 0.7646. A hole 3 × 2 m and 300 mm deep is 2.35 cubic yards.

How many cubic metres are in a cubic yard?

About 0.76. A yard is exactly 0.9144 m, so a cubic yard is 0.7646 m³.

What size skip do I need?

Work out the m³ you will dig, then add 25–30% for dug soil. Our 1.8 m³ hole needs about 2.3 m³ of room. That fits a 4 yard skip.

How many bin bags fit in a skip?

One skip firm says a 2 yard skip takes about 16 bin bags. A 4 yard skip takes 33, and a 6 yard skip 50. Treat it as a rough guide.

What size skip can take soil and rubble?

In home-size skips, 8 yards or smaller, says SunSkips. Bigger ones are for light, bulky waste. L&S Waste says don't fill even an 8 yard skip with only soil or rubble.

How much weight can a skip hold?

About 1 tonne per cubic yard, say two skip firms. So a 4 yard skip takes about 4 tonnes. Firms charge extra for a skip that is too heavy.

Can you fill a skip above the top?

No. A council licence rule says soil and rubble must not go above the metal sides. One firm says to fill only to the line marked on the side.

Do I need a licence for a skip on the road?

Yes. A skip on a public road needs a licence from the council. Your skip firm can tell you more.

Where our numbers come from

Made by BuildersCount. Last checked 4 Oct 2026.