Measure your project

Slab
Patio, path or floor
How thick is the slab?

From building codes, town rules and a ready-mix maker.

Extra for spills

Sakrete, a bag maker, suggests about 10%.

Stone base under the slab?

The depth after packing down. The rules we read ask for at least 4 in.

Wire mesh in the slab?

One roll covers 750 sq ft, before overlaps.

Your answer

You need about
3.26cubic yards

That is 88.0 cubic feet. We added 10% extra.

It weighs about 11,200 lb (5.6 tons) fresh. Quikrete's figure: 140 lb per cubic foot.

If you buy bags

147
bags of 80 lb
11,760 lb in total
196
bags of 60 lb
11,760 lb in total
235
bags of 50 lb
11,750 lb in total
294
bags of 40 lb
11,760 lb in total

One 80 lb bag makes 0.6 cubic feet of concrete.

If you order a truck (ready-mix)

Ask for 3.50 cubic yards. We round up to the next quarter yard.

This answer is a guide. For a driveway, floor or anything that holds weight, check your local building rules or ask a builder or engineer.

Which costs less?

Bags
$954
147 × 80 lb
Truck
$952
3.50 cubic yards
A truck costs $2 less

You also skip mixing 147 bags by hand. Have the wooden edges (forms) ready before the truck comes.

Prices are US middle prices from October 2026. Ask your store for their price.

Quick answers

Materials for a concrete slab
The concrete, a stone base under it, and wire mesh if you use it. Turn on the base and mesh above to add them.
Yards of concrete per square foot
At 4 in thick, each square foot takes 0.333 cubic feet, or about 0.0123 cubic yards. One cubic yard covers about 81 sq ft.
Thickness by job
4 in for a patio, walk, car driveway, garage floor or shed. 5 in or more for heavy trucks.
Rebar in a concrete slab or patio
The US home building code (IRC) has no rule that a slab on the ground needs steel. Some towns do. To count bars, use our rebar for slab calculator.

How to work it out

  1. Measure the length and width in feet. Multiply them for the square feet.
  2. Pick the thickness in inches. Divide by 12 to get feet.
  3. Square feet × thickness = cubic feet. Add 10% extra, then divide by 27 for cubic yards.
  4. Stone base: square feet × depth in feet ÷ 27. Times 1.33 for packing down, then times 1.4 for tons.
  5. Mesh: square feet ÷ 750 (one roll). Round up.

20 × 12 = 240 sq ft
240 × 4 ÷ 12 = 80 cubic feet
80 + 10% = 88 cubic feet ÷ 27 = 3.26 cubic yards
Or 88 ÷ 0.6 = 147 bags of 80 lb
Base, 4 in deep: 240 × 4 ÷ 12 ÷ 27 = 2.96 cubic yards packed
2.96 × 1.33 = 3.94 cubic yards loose × 1.4 = 5.52 tons
Mesh: 240 ÷ 750 = 0.32 → 1 roll

Concrete, base and mesh for common slabs

Each slab is 4 in thick, on a 4 in stone base. The calculator gives the same answers.

Slabs 4 in thick on 4 in of crusher run
Job and sizeConcrete (cubic yards)Crusher run (tons)Mesh rolls
Small patio, 10 × 10 ft1.362.301
Shed slab, 10 × 12 ft1.632.761
1-car garage slab, 12 × 20 ft3.265.521
Typical patio, 16 × 18 ft3.916.621
2-car garage slab, 24 × 24 ft7.8213.241
3-car garage slab, 36 × 24 ft11.7319.862

Concrete: with 10% extra. Stone: packed 4 in deep, with no extra. Mesh: before overlaps.

These are common garage, shed and patio sizes, from makers and builders.

When can you walk or drive on it? See our concrete cure time page.

Know your square feet? See square feet in a yard of concrete for other thicknesses.

For the concrete alone in more sizes, see the size table on our concrete calculator.

Slab thickness by job

The thickness chips in the calculator use these figures. Here is who gives each one.

  • 3½ in: a house floor, says the US home building code (IRC).
  • 4 in: a patio or walk (Palatine, IL), a car driveway (County Ready Mix) or a garage floor (Wisconsin's code).
  • 4 in for a shed: West Fargo, ND asks for at least 3½ in. We use 4 in, as for a patio.
  • 5 in or more: garbage trucks and other heavy vehicles (County Ready Mix).

Your town may ask for more. Our concrete thickness guide explains each job and the gravel under it.

Crusher run under a concrete slab

Crusher run is crushed stone with its dust left in. The calculator gives tons and cubic yards.

Loose stone packs down. Penn State's road guide says 8 in of loose stone packs to 6 in. So we add 33% to the packed depth.

A loose cubic yard of crusher run weighs about 1.4 tons. That is the middle of the suppliers and road agencies we read.

We add no extra for spills to the stone. Our crusher run calculator starts at 10% extra, so its tons are higher. It also has prices.

Our thickness guide works out gravel instead. The US Army says to order 17% more gravel than its packed depth. Gravel packs down less, so those tons differ from these.

Under a house floor below ground level, the IRC asks for 4 in of clean sand, gravel or crushed stone. Crusher run has dust in it, so ask your supplier which stone fits your job. Our crushed stone calculator works out clean stone, such as #57.

Wire mesh for the slab

Wire mesh comes in rolls. A common roll is 5 × 150 ft, so it covers 750 sq ft.

The calculator divides your slab's area by 750 and rounds up. The pieces must overlap, so a slab close to 750 sq ft may need a second roll.

The right mesh depends on the slab's longest side, says the Wire Reinforcement Institute. Our rebar for slab calculator picks it, prices the rolls and counts steel bars.

A concrete slab foundation or floor

A house or garage floor on the ground is a slab too. Footings are the deeper strips under its walls. Use our footing calculator for them.

West Fargo, ND asks for a thicker edge on a shed or garage slab. It is 12 in deep and 12 in wide. Wisconsin's code wants a garage floor to slope to the main door or a drain.

For a price or a quote, use our concrete slab cost calculator. To mix your own from cement, sand and gravel, see our cement calculator.

For what a slab weighs, see concrete weight.

For a driveway, floor or anything that holds weight, check your local building rules or ask a builder or engineer.

Questions people ask

How much concrete do I need for a 10 × 10 slab?

At 4 in thick, the slab is 1.23 cubic yards. Buy 1.36 with 10% extra, or 62 bags of 80 lb. The 4 in stone base under it is about 2.30 tons.

How much concrete do I need for a patio?

A 16 × 18 ft patio, 4 in thick, takes about 3.91 cubic yards with 10% extra.

How much concrete do I need for a shed base?

A slab for a 10 × 12 ft shed, 4 in thick, takes about 1.63 cubic yards with 10% extra. That is 74 bags of 80 lb.

How much concrete do I need for a driveway?

A 1-car driveway, 12 × 24 ft and 4 in thick, takes about 3.91 cubic yards. A 2-car driveway, 24 × 24 ft, takes about 7.82. Both include 10% extra.

How many tons of crusher run go under a slab?

For each 100 sq ft, about 2.30 tons at 4 in deep, or 3.45 tons at 6 in. That allows for packing down, but adds no extra for spills.

How many rolls of wire mesh do I need for a slab?

Divide the slab's square feet by 750. That is one common 5 × 150 ft roll. Round up, and leave room for the overlaps.

How do I calculate concrete for a foundation?

A slab foundation uses the same formula as any slab: length × width × thickness. The footings under the walls are a separate sum, so use our footing calculator for them.

Where our numbers come from

Made by BuildersCount. Last checked 15 Oct 2026.

Cite this page

BuildersCount. (2026, October 15). Concrete Slab Calculator. https://builderscount.com/concrete-slab-calculator/