Asphalt Driveway Calculator

Find how much asphalt and stone a new driveway needs, and a rough crew price.

Made by BuildersCount · Last checked 4 Oct 2026 · Our sources

Measure your driveway

Lengthftin
Widthftin
How thick is the asphalt, after rolling?

Colorado's asphalt group: two layers, 2 in under 1.5 in. Oregon's guide: 2.5 in, laid as one layer. Or type your own.

How deep is the stone base?

Colorado's asphalt group says 6–8 in. Oregon's guide says 4 in on excellent ground, 8 in on good ground, 12 in on fair ground.

Pick a size above, or type your own.

Extra for edges and low spots

Your answer

A pro will charge about
$6,000

For 600 sq ft. Cost guides range from $2,352 to $9,000.

12.8
tons of asphalt
3.5 in thick
27.6
tons of crusher run
8 in base, packed

Use the tons to check a quote. A crew must spread and roll asphalt while it is hot.

This answer is a guide. Your ground and traffic change what a driveway needs. Check your local building rules or ask a builder or engineer.

What it costs

Hire a pro
$6,000
600 sq ft × $10
Materials only
$2,735
Asphalt $1,219 + stone $1,516

The crew price is the middle of 3 cost guides. The asphalt price is the middle of New York State's plant list, before trucking. Crusher run is the middle of 5 suppliers' prices (Oct 2026).

Quick answers

A 50 × 12 ft driveway
About $6,000 to have it laid, at the middle of 3 cost guides. It takes about 12.8 tons of asphalt.
How thick does asphalt need to be for a driveway?
Colorado's asphalt group says 3.5 in, as a 2 in layer under a 1.5 in layer. Oregon's group says 2.5 in, laid as one layer. Our asphalt driveway thickness guide has more.
How deep a stone base?
6–8 in, says the Colorado group. Oregon's guide says 4–12 in, by how firm the ground is.
When can I drive on it?
The Colorado group says to wait "a few days". One contractor says at least 3 days, or 5 days above 80 °F.
When should I seal it?
Sealer makers say wait 6–12 months. Other sources differ; see below. Then reseal every 2–5 years, says the Colorado group.

How to work it out

  1. Measure the driveway's length and width in feet. Multiply them for square feet.
  2. Asphalt: square feet × inches thick × 110 lb ÷ 9. Divide by 2,000 for tons.
  3. Stone base: square feet × inches deep ÷ 12 ÷ 27. That gives cubic yards, packed down.
  4. Order loose stone: × 1.33 for packing down, then × 1.4 for tons.

50 × 12 = 600 sq ft
600 × 3.5 in × 110 lb ÷ 9 = 25,667 lb
25,667 ÷ 2,000 = 12.83 tons of asphalt
600 × 8 in ÷ 12 ÷ 27 = 14.815 cubic yards
14.815 × 1.33 × 1.4 = 27.59 tons of crusher run
600 sq ft × $10 = $6,000 for a crew

How thick, and how deep a base

To try another figure, type it in the "Asphalt, rolled" box. For the layers, spread thickness and trucks, see our asphalt driveway thickness guide.

Thickness after rolling, and tons for 600 sq ft
Who says itThicknessTons
Colorado asphalt group3.5 in, two layers12.8
Oregon asphalt group2.5 in, one layer9.2
A Chicago paving firm, with trucks3 in11.0
A Chicago paving firm, cars only2 in7.3

The Chicago firm was quoted in Asphalt magazine.

The stone base

The Colorado group says to lay 6–8 in of crushed stone under the asphalt.

Oregon's guide sets the base by how firm the ground is.

  • Excellent ground: 4 in
  • Good ground: 8 in
  • Fair ground: 12 in

Cars and trucks press hard on a driveway. Check your local building rules or ask a builder or engineer before you choose. Ask your town if a permit is needed, too.

Tons for a few driveway sizes

Use this table to check a paving quote.

Asphalt 3.5 in thick, over 8 in of crusher run
DrivewayAsphalt, tonsCrusher run, tonsCrew price
10 × 20 ft4.39.2$2,000
12 × 30 ft7.716.6$3,600
12 × 50 ft12.827.6$6,000
16 × 40 ft13.729.4$6,400
24 × 24 ft12.326.5$5,760
20 × 60 ft25.755.2$12,000

No extra added. Crusher run is ordered loose: 1.33 times the packed amount. Crew price is $10 per sq ft.

This calculator adds no extra to start. The crusher run calculator adds 10% for stone. For tons alone, use our asphalt calculator.

Cost guides say a new asphalt driveway costs $3.92–$15 per sq ft, laid. We use $10, the middle of 3 guides. Our asphalt driveway cost guide has prices to install, repave, resurface, replace and seal a driveway.

Driving on it and sealing it

The Colorado group says to wait "a few days" before you drive on new asphalt. Keep a heavy moving truck off it at the start, too.

An Illinois contractor says keep cars off for at least 3 days, or 5 days above 80 °F. Wait up to 14 days to park on it.

The first seal

Sources don't agree on when to seal a new driveway.

  • Sealer makers: wait 6–12 months.
  • The Colorado group: wait until it is "several months" old.
  • The Illinois contractor: about 90 days, and within 1 year.
  • The Asphalt Institute: new asphalt with light traffic should not need sealing for about 2–5 years. It depends on the weather and how well it was laid.

How often after that? The Colorado group says to reseal every 2–5 years. To do it yourself, our driveway sealer calculator counts the pails.

Questions people ask

How do you calculate asphalt for a driveway?

Multiply the square feet by the inches thick and by 110 lb. Divide by 9, then by 2,000 for tons. A 50 × 12 ft driveway, 3.5 in thick, takes about 12.8 tons.

How many inches of asphalt for a driveway?

3.5 in in two layers, or 2.5 in in one, say the Colorado and Oregon asphalt groups. Our asphalt driveway thickness guide has more.

When can you drive on an asphalt driveway?

Colorado's asphalt group says to wait "a few days". An Illinois contractor says at least 3 days, or 5 days above 80 °F. It says to wait up to 14 days before you park.

How long does a new asphalt driveway need to cure?

An Illinois contractor says 6–12 months to harden all the way. You can drive on it long before that.

Do asphalt driveways need to be sealed?

Not at first. The Asphalt Institute says new asphalt with light traffic should not need it for about 2–5 years. It depends on the weather and how well it was laid.

How much gravel base goes under an asphalt driveway?

The Colorado group says 6–8 in of crushed stone. For a 50 × 12 ft driveway, 8 in deep, that is about 27.6 tons of crusher run, ordered loose.

Where our numbers come from

Made by BuildersCount. Last checked 4 Oct 2026.

Cite this page

BuildersCount. (2026, October 4). Asphalt Driveway Calculator. https://builderscount.com/asphalt-driveway-calculator/