BuildersCount

Cement Calculator

Find the cubic yards or m³ of concrete for your job. Then use the tables to turn it into bags of cement, sand and stone.

Made by BuildersCount · Last checked 4 Oct 2026 · Our sources

Measure your project

I measure in
Slab
Base, patio, path or floor
How thick is the slab?
Extra for spills

10% is what Sakrete's US slab calculator adds.

Your answer

You need about
1.09cubic yards

That is 29.3 cubic feet, or 0.83 m³. We added 10% extra.

If you buy bags

59
bags of 30 kg
1,770 kg in total

These bags are 30 kg premix, with the sand and stone already in. For bags of cement, see the tables below.

If you order a truck (ready-mix)

Ask for 1.00 m³ (about 1.31 cubic yards). The smallest load on Ontario plant lists is 1 m³, so we price at least that.

This is a guide. For footings, posts or slabs that hold weight, check your local building rules or ask a builder or engineer.

Which costs less?

Bags
$412
59 × 30 kg
Truck
$667
1.00 m³ + small-load fee + fees
Bags cost $255 less

But you must mix 59 bags by hand. That is 1.8 tonnes to lift.

Pouring from 1 Nov to 30 Apr?

Ready-mix (25 MPa): the middle of 4 lists from 3 companies in Ontario and Calgary. Premix bags: the middle of 8 prices at 5 Ontario stores. October 2026, before GST/HST.

Quick answers

40 kg bags of cement per m³
10 by Sakrete's sheet, or 7.5 by Marco's. The makers differ, so we show both.
Per cubic yard of concrete
About 7.65 bags at Sakrete's rate, or 5.73 at Marco's.
Mix by volume
1 cement : 2.5 sand : 2.5 stone, says Sakrete. The building code (Part 9) mix with 20 mm stone is 1 : 1.75 : 2.5.
Price of a 40 kg bag
$25.85, the middle of 4 sellers. Ontario stores charge about $23.70 (3 stores).
10 × 8 ft pad, 4 in thick
0.83 m³ with 10% extra. That takes 9 bags of cement at Sakrete's rate.

How to work it out

  1. Use the calculator to find the cubic yards or m³ of concrete.
  2. Multiply the m³ by 10 for 40 kg bags of cement. Round up.
  3. For Sakrete's mix, multiply the m³ by 0.7. That gives the m³ of sand, and of stone.
  4. In cubic yards, use 7.65 bags for each yard.

10 × 8 × 4 ÷ 12 = 26.7 cubic feet
26.7 + 10% = 29.3 cubic feet = 0.83 m³
0.83 × 10 = 8.3 → 9 bags of cement
0.83 × 0.7 = 0.58 m³ of sand, and the same of stone

Cement content: bags, sand and stone per m³

Portland cement comes in 40, 30 and 20 kg bags. 40 kg is the usual size. Canada calls general-use cement "GU", but many store listings still say "Type 10".

US guides count 94 lb bags of Portland cement. Our 40 kg bag is about 88 lb, so use 40 kg here.

40 kg bags of cement, sand and stone for 1 m³
MixBags per m³Bags per yardSand, m³Stone, m³
Sakrete, 1 : 2.5 : 2.5107.650.70.7
Code mix, 1 : 1.75 : 2.5107.650.490.7
Marco (mix not given)7.55.73––

About figures, by volume. Sand and stone are loose and damp. The code mix row uses Sakrete's 10 bags per m³.

Sakrete says one 40 kg bag makes about 0.1 m³ (3.5 cubic feet). Marco says 120 kg makes 0.4 m³. That is why the counts differ.

The cement content is the cement in each m³ of concrete. At Sakrete's rate it is about 400 kg, and at Marco's about 300 kg.

The code's own site mix

The building code (Part 9) gives a mix for plain concrete you make on site. One part is one 40 kg bag of cement, about 28 L.

Site-mixed concrete, per bag of cement
Biggest stoneCementDamp sandStone
14 mm1 bag (28 L)49 L56 L
20 mm1 bag (28 L)49 L70 L
28 mm1 bag (28 L)56 L84 L
40 mm1 bag (28 L)56 L98 L

From Table 9.3.1.7, as printed in the BC Building Code 2018. Check the code where you live.

We use the 20 mm row. That is about the ¾ in stone in Sakrete's mix. Sakrete adds 20–23 L of water per bag for its own mix.

Cement for common jobs

Each job has 10% extra. Compare the cement bags with ready-to-use premix bags, which already hold the sand and stone.

40 kg cement bags, or 30 kg premix bags
Jobm³Cement (10/m³)Cement (7.5/m³)Premix bags
Slab 10 × 8 ft, 4 in thick0.839759
4 piers, 10 in wide, 4 ft deep0.273320
Footing 40 ft long, 10 × 4 in0.354325

Footings and piers hold weight. Check your local building rules or ask a builder or engineer.

A bag of cement makes about 7 times as much concrete as a bag of premix. But you must buy and mix the sand and stone too.

Mix your own, premix or a truck?

What 1 m³ costs, before tax
WayCostNot counted
10 bags of cement (Sakrete's rate)$258.50Sand, stone and mixing
7.5 bags of cement (Marco's rate)$193.88Sand, stone and mixing
72 bags of 30 kg premix$503.28Mixing
Ready-mix, 25 MPa$255.50Small-load and plant fees

Cement: $25.85 a bag, the middle of 4 sellers. Premix: $6.99, 5 Ontario stores. Ready-mix: Ontario and Calgary lists.

The cement alone costs about as much as 1 m³ of ready-mix. Sand, stone and mixing come on top, plus a cement mixer if you rent one. On a small job, a truck's small-load fee can change that.

Masonry cement is for mortar

Masonry cement makes mortar. It is mostly mixed with sand, 1 part to 2¼ to 3 parts. One Type S mix adds ½ part Portland cement too. Ontario stores sell 30–33 kg bags of Type S masonry cement for about $23.66 (only 3 stores). Pre-mixed mortar already holds the sand, and a 30 kg bag makes about 18 L.

See the concrete block calculator for mortar by the wall.

Questions people ask

How many 40 kg bags of cement make 1 m³ of concrete?

10 bags of 40 kg, says Sakrete Canada. Marco's sheet works out to 7.5. Our tables use the higher count.

How many bags of cement are in a yard of concrete?

About 7.65 bags of 40 kg, so buy 8. At Marco's rate it is 5.73, so buy 6.

How do I work out cement in yards?

Multiply the square feet by the thickness in inches. Divide that by 324, and you have cubic yards. Then multiply by 7.65 for bags.

What is the mix ratio for concrete?

Sakrete uses 1 part cement, 2.5 parts sand and 2.5 parts ¾ in stone. The building code (Part 9) uses 1 : 1.75 : 2.5 with 20 mm stone.

How much sand and stone for 1 m³ of concrete?

About 0.7 m³ of sand and 0.7 m³ of stone, with Sakrete's mix. Measure them loose and damp.

How much water goes in a 40 kg bag of cement?

20–23 L, says Sakrete, for its sand and stone mix.

How much is a bag of cement in Canada?

About $25.85 for 40 kg, before tax. That is the middle of 4 sellers in Ontario and BC, and one price was a sale.

What do you mix masonry cement with?

Mostly sand. The building code (Part 9) mixes 1 part masonry cement with 2¼ to 3 parts damp sand. One Type S mix also adds ½ part Portland cement.

Where our numbers come from

Made by BuildersCount. Last checked 4 Oct 2026.