Screed Calculator
Find how much floor screed you need for your m² and thickness, as sharp sand and cement.
Measure your job
Your answer
For 12.0 m² at 50 mm, mixed 1 : 4.
Bulk bags are 800 kg. Bags are rounded up.
This answer is a guide. For footings, walls or anything that holds weight, check your local building rules or ask a builder or engineer.
What it costs
UK middle prices from October 2026, with VAT. Cement: £8.39 a 25 kg bag (7 prices from 3 sellers). Bulk bags: £75, building sand £67.35 (3 sellers each). Few prices, so treat them as a rough guide.
Quick answers
- Screed per m²
- About 2 kg of dry mix for each mm of thickness. So 50 mm takes 100 kg per m².
- Thickness (BS 8204)
- At least 25 mm bonded, 50 mm unbonded and 75 mm floating, says the MPA. Homes can use 65 mm floating.
- 1 m³ of screed at 1 : 4
- 400 kg of cement (16 bags) and 1,600 kg of sharp sand (2 bulk bags).
- Liquid screed
- Cemfloor's is laid thinner: 35 mm floating in a home, and 25 mm above heating pipes.
- Drying
- About 1 day per mm for the first 50 mm of sand and cement screed (BS 8204).
How to work it out
- Measure the floor in metres. Length × width gives m².
- Multiply the m² by the thickness in mm, then by 2 kg. That is the dry mix.
- For a 1 : 4 mix, one part in 5 is cement. The rest is sharp sand.
- Cement ÷ 25 kg gives the number of bags. Round up.
- Divide the sand by 800 for bulk bags. Round up.
4 × 3 m = 12 m² × 50 mm × 2 = 1,200 kg
Cement: 1,200 ÷ 5 = 240 kg → 10 bags
Sand: 960 kg ÷ 800 → 2 bulk bags
How thick does screed need to be?
Before screeding, find out what the screed will sit on. LABC Warranty, a building warranty firm, uses these words:
- Bonded: stuck down to a hard concrete base.
- Unbonded: laid on a separating sheet (a membrane).
- Floating: laid on a soft layer, with mesh in it.
| Type | Sand and cement | Liquid screed |
|---|---|---|
| Bonded | 25 mm (40 usual) | 20 mm |
| Unbonded | 50 mm (70 usual) | 30 mm |
| Floating | 75 mm (65 in homes) | 35 mm in homes |
| Over underfloor heating | 75 mm, floating (Tarmac) | 25 mm above the pipes |
Sand and cement: BS 8204, as the MPA gives it. Liquid: Cemfloor Complete, a cement-based liquid screed.
The calculator's buttons are 40, 50, 65, 75 mm, from these figures. For a floor that takes heavy loads, check your local building rules or ask a builder or engineer.
Sharp sand and cement for 1 m³ of floor screed
The materials for traditional screed are sharp sand and cement. BS 8204 mixes them by weight. The usual mix is 1 : 4, and it can go from 1 : 3 to 1 : 4.5. We allow 2 kg of dry mix per m² for each mm, the top of the makers' range.
| Mix | Cement, kg (25 kg bags) | Sharp sand, kg (800 kg bulk bags) |
|---|---|---|
| 1 : 3 | 500 (20) | 1,500 (2) |
| 1 : 4 | 400 (16) | 1,600 (2) |
| 1 : 4.5 | 364 (15) | 1,636 (3) |
By weight, with nothing extra. Water is not included.
Once set and dry, 1 m³ weighs about 2–2.2 tonnes, says Tarmac. For a table per m², by thickness, see our sand and cement calculator.
Screed in bags, ready-mix or liquid screed
Bags of screed
Pre-blended screed, such as Mapei's, comes in 25 kg bags. We use the same 2 kg per m² for each mm.
| Thickness | Per m² | Bags per m² | Bags for 10 m² |
|---|---|---|---|
| 40 mm | 80 kg | 3.2 | 32 |
| 50 mm | 100 kg | 4 | 40 |
| 65 mm | 130 kg | 5.2 | 52 |
| 75 mm | 150 kg | 6 | 60 |
Coverage: our sums at 2 kg per m² per mm, the top of Mapei's range. Heidelberg's 20 kg bag covers 0.22 m² at 50 mm.
Ready-mix screed
Ready-mix screed is sold by the m³. For prices per m³ and per m² laid, see our floor screeding cost page.
Liquid screed
Cemfloor's liquid screed levels itself and goes down thinner. At 35 mm, 1 m³ covers about 28.6 m². It comes in 25 kg and 1,000 kg bags.
Self-levelling compound for a thin layer
For a thin top layer, makers sell levelling compound in bags. ARDEX K 15 goes down 1.5–35 mm thick. Mix each 22 kg bag with 5.25–5.5 litres of water. You can walk on it after 2 hours.
| Depth | ARDEX K 15 (22 kg) | Mapei Ultraplan Renovation (25 kg) |
|---|---|---|
| 3 mm | 2 | 3 |
| 5 mm | 4 | 4 |
| 10 mm | 7 | 8 |
Our sums: ARDEX 1.4 kg and Mapei 1.8 kg per m² for each mm. Rounded up. Mapei's figure is from a non-UK copy of its data sheet.
How long does screed need to dry?
- Sand and cement: keep it under plastic sheeting for at least 5 days, says the MPA. Then allow about 1 day per mm for the first 50 mm (BS 8204). Each mm after that takes longer.
- Factory screed: Tarmac says its Truscreed takes about 5–7 days per 25 mm. Don't speed it up with heaters or underfloor heating.
- Liquid screed: Cemfloor allows light foot traffic after 24–48 hours. It can be force dried after 7 days. Tiles can go down in as little as 5 days, with the right adhesive. Check it is dry enough before you lay flooring.
Lining the walls too? Our plasterboard calculator counts the boards.
Questions people ask
How much screed do I need?
Multiply the floor's m² by the thickness in mm, then by 2 kg. A 4 × 3 m floor at 50 mm needs about 1,200 kg of dry mix.
How much screed per m²?
About 2 kg of dry sand and cement for each mm. At 50 mm, that is 100 kg per m².
How much sharp sand do I need for screed?
At 1 : 4, about 1.6 kg per m² for each mm. So 1 m³ of screed takes about 1,600 kg of sharp sand.
How much screed over underfloor heating?
Tarmac gives 75 mm for a floating screed over heating pipes. LABC Warranty asks for at least 25 mm over the pipes. Cemfloor's liquid screed needs 25 mm above them.
How much does 1 m³ of screed weigh?
About 2–2.2 tonnes once set and dry, says Tarmac. Cemfloor's liquid screed weighs 2.1–2.2 tonnes per m³ when fresh.
How many bags of screed do I need?
About 4 bags of 25 kg per m² at 50 mm. So 10 m² takes about 40 bags.
How long does screed take to dry?
For sand and cement, BS 8204 allows 1 day per mm for the first 50 mm. So 50 mm takes about 50 days, and thicker screed takes longer.
How much self-levelling compound do I need?
ARDEX K 15 uses about 1.4 kg per m² for each mm. One 22 kg bag covers about 5.25 m² at 3 mm. Mapei Ultraplan Renovation uses 1.8 kg.
Where our numbers come from
- Screed mix and thickness: Mineral Products Association Mortar Data Sheet 22
- Screed types and thickness: LABC Warranty Technical Manual
- Screed: Tarmac Truscreed data sheet (weight once dry; thickness over underfloor heating)
- Liquid screed thickness: Cemfloor Complete data sheet (35 mm floating)
- Liquid screed drying: Cemfloor brochure (force-dry after 7 days)
- Screed per m²: Kilsaran KPRO Floor screed (about 1.95 kg per m² per mm)
- Ready-mixed mortar bags: Heidelberg Sand & Cement Mortar data sheet (20 kg lays about 19 bricks)
- Screed per m²: Mapei Topcem Pronto data sheet (18–20 kg per m² per cm)
- Self-levelling compound: ARDEX K 15 data sheet (5.25 m² at 3 mm)
- Self-levelling compound: Mapei Ultraplan Renovation data sheet (1.8 kg/m²/mm)
- Screed drying: Ronacrete, drying of screeds (BS 8204-1: 1 day per mm)
- Mix ratios and 25 kg bags: Heidelberg General Purpose cement data sheet
- Ballast weight: Wickes ballast bulk bag (800 kg covers 9.7 m² at 50 mm)
- Sand weight: Wickes sharp sand bulk bag (800 kg covers 10.6 m² at 50 mm)
- Cement price: the middle of 7 prices from 3 UK sellers (25 kg, Oct 2026)
- Bulk bag prices: the middle price from 3 UK sellers each (Wickes, Tippers, Lawsons; Oct 2026)
Made by BuildersCount. Last checked 14 Oct 2026.