BuildersCount

Screed Calculator

Find how much floor screed you need for your m² and thickness, as sharp sand and cement.

Made by BuildersCount · Last checked 14 Oct 2026 · Our sources

Measure your job

How thick?
Which mix? (cement : sand, by weight)
Extra for spills

No UK source gives a waste figure, so we start at 0%. Pick 5% or 10% if you want some spare.

Your answer

You need about
10bags of cement

For 12.0 m² at 50 mm, mixed 1 : 4.

10
bags of cement (25 kg)
240 kg
2
bulk bags of sharp sand
0.96 tonnes

Bulk bags are 800 kg. Bags are rounded up.

This answer is a guide. For footings, walls or anything that holds weight, check your local building rules or ask a builder or engineer.

What it costs

Mix your own
£234
Cement £84 + Sharp sand £150

UK middle prices from October 2026, with VAT. Cement: £8.39 a 25 kg bag (7 prices from 3 sellers). Bulk bags: £75, building sand £67.35 (3 sellers each). Few prices, so treat them as a rough guide.

Quick answers

Screed per m²
About 2 kg of dry mix for each mm of thickness. So 50 mm takes 100 kg per m².
Thickness (BS 8204)
At least 25 mm bonded, 50 mm unbonded and 75 mm floating, says the MPA. Homes can use 65 mm floating.
1 m³ of screed at 1 : 4
400 kg of cement (16 bags) and 1,600 kg of sharp sand (2 bulk bags).
Liquid screed
Cemfloor's is laid thinner: 35 mm floating in a home, and 25 mm above heating pipes.
Drying
About 1 day per mm for the first 50 mm of sand and cement screed (BS 8204).

How to work it out

  1. Measure the floor in metres. Length × width gives m².
  2. Multiply the m² by the thickness in mm, then by 2 kg. That is the dry mix.
  3. For a 1 : 4 mix, one part in 5 is cement. The rest is sharp sand.
  4. Cement ÷ 25 kg gives the number of bags. Round up.
  5. Divide the sand by 800 for bulk bags. Round up.

4 × 3 m = 12 m² × 50 mm × 2 = 1,200 kg
Cement: 1,200 ÷ 5 = 240 kg → 10 bags
Sand: 960 kg ÷ 800 → 2 bulk bags

How thick does screed need to be?

Before screeding, find out what the screed will sit on. LABC Warranty, a building warranty firm, uses these words:

  • Bonded: stuck down to a hard concrete base.
  • Unbonded: laid on a separating sheet (a membrane).
  • Floating: laid on a soft layer, with mesh in it.
Smallest screed thickness, by type
TypeSand and cementLiquid screed
Bonded25 mm (40 usual)20 mm
Unbonded50 mm (70 usual)30 mm
Floating75 mm (65 in homes)35 mm in homes
Over underfloor heating75 mm, floating (Tarmac)25 mm above the pipes

Sand and cement: BS 8204, as the MPA gives it. Liquid: Cemfloor Complete, a cement-based liquid screed.

The calculator's buttons are 40, 50, 65, 75 mm, from these figures. For a floor that takes heavy loads, check your local building rules or ask a builder or engineer.

Sharp sand and cement for 1 m³ of floor screed

The materials for traditional screed are sharp sand and cement. BS 8204 mixes them by weight. The usual mix is 1 : 4, and it can go from 1 : 3 to 1 : 4.5. We allow 2 kg of dry mix per m² for each mm, the top of the makers' range.

Cement and sharp sand for 1 m³ of screed
MixCement, kg (25 kg bags)Sharp sand, kg (800 kg bulk bags)
1 : 3500 (20)1,500 (2)
1 : 4400 (16)1,600 (2)
1 : 4.5364 (15)1,636 (3)

By weight, with nothing extra. Water is not included.

Once set and dry, 1 m³ weighs about 2–2.2 tonnes, says Tarmac. For a table per m², by thickness, see our sand and cement calculator.

Screed in bags, ready-mix or liquid screed

Bags of screed

Pre-blended screed, such as Mapei's, comes in 25 kg bags. We use the same 2 kg per m² for each mm.

Bags of 25 kg screed
ThicknessPer m²Bags per m²Bags for 10 m²
40 mm80 kg3.232
50 mm100 kg440
65 mm130 kg5.252
75 mm150 kg660

Coverage: our sums at 2 kg per m² per mm, the top of Mapei's range. Heidelberg's 20 kg bag covers 0.22 m² at 50 mm.

Ready-mix screed

Ready-mix screed is sold by the m³. For prices per m³ and per m² laid, see our floor screeding cost page.

Liquid screed

Cemfloor's liquid screed levels itself and goes down thinner. At 35 mm, 1 m³ covers about 28.6 m². It comes in 25 kg and 1,000 kg bags.

Self-levelling compound for a thin layer

For a thin top layer, makers sell levelling compound in bags. ARDEX K 15 goes down 1.5–35 mm thick. Mix each 22 kg bag with 5.25–5.5 litres of water. You can walk on it after 2 hours.

Bags of levelling compound for 10 m²
DepthARDEX K 15 (22 kg)Mapei Ultraplan Renovation (25 kg)
3 mm23
5 mm44
10 mm78

Our sums: ARDEX 1.4 kg and Mapei 1.8 kg per m² for each mm. Rounded up. Mapei's figure is from a non-UK copy of its data sheet.

How long does screed need to dry?

  • Sand and cement: keep it under plastic sheeting for at least 5 days, says the MPA. Then allow about 1 day per mm for the first 50 mm (BS 8204). Each mm after that takes longer.
  • Factory screed: Tarmac says its Truscreed takes about 5–7 days per 25 mm. Don't speed it up with heaters or underfloor heating.
  • Liquid screed: Cemfloor allows light foot traffic after 24–48 hours. It can be force dried after 7 days. Tiles can go down in as little as 5 days, with the right adhesive. Check it is dry enough before you lay flooring.

Lining the walls too? Our plasterboard calculator counts the boards.

Questions people ask

How much screed do I need?

Multiply the floor's m² by the thickness in mm, then by 2 kg. A 4 × 3 m floor at 50 mm needs about 1,200 kg of dry mix.

How much screed per m²?

About 2 kg of dry sand and cement for each mm. At 50 mm, that is 100 kg per m².

How much sharp sand do I need for screed?

At 1 : 4, about 1.6 kg per m² for each mm. So 1 m³ of screed takes about 1,600 kg of sharp sand.

How much screed over underfloor heating?

Tarmac gives 75 mm for a floating screed over heating pipes. LABC Warranty asks for at least 25 mm over the pipes. Cemfloor's liquid screed needs 25 mm above them.

How much does 1 m³ of screed weigh?

About 2–2.2 tonnes once set and dry, says Tarmac. Cemfloor's liquid screed weighs 2.1–2.2 tonnes per m³ when fresh.

How many bags of screed do I need?

About 4 bags of 25 kg per m² at 50 mm. So 10 m² takes about 40 bags.

How long does screed take to dry?

For sand and cement, BS 8204 allows 1 day per mm for the first 50 mm. So 50 mm takes about 50 days, and thicker screed takes longer.

How much self-levelling compound do I need?

ARDEX K 15 uses about 1.4 kg per m² for each mm. One 22 kg bag covers about 5.25 m² at 3 mm. Mapei Ultraplan Renovation uses 1.8 kg.

Where our numbers come from

Made by BuildersCount. Last checked 14 Oct 2026.

Cite this page

BuildersCount. (2026, October 14). Screed Calculator. https://builderscount.com/uk/screed-calculator/