How Much Concrete Does a Truck Hold in NZ?

A full-size truck holds about 5–6 m³. A mini-mix truck holds up to about 2.4 m³. Type your amount to count the trucks.

By BuildersCount · Last checked 15 Oct 2026 · Our sources

How much concrete?

Which truck?

Plants say 5–6 m³. We count 6 m³ as a full truck.

Your answer

You need
2trucks

8 m³. Truck: Full-size truck (6 m³).

  • Order8 m³
  • Last truck2 m³
  • Small-order fee$115

This answer is a guide. Ask the plant what its trucks carry and how it rounds an order. For a slab or drive, check your local building rules or ask a builder or engineer.

What it costs

Ready-mix
$2,493
8 m³ × $297.28 + $115 fee

Ready-mix: one merchant's 20 MPa price (Oct 2026), with GST. Few sellers, so get a quote. Allied's $115 small-order fee: the order size it applies to isn't published. We add it once to every order. Set it to $0 if your plant doesn't charge it.

Quick answers

Concrete truck capacity in NZ
About 5–6 m³ in a full-size truck. One Waikato plant runs 5 m³ trucks and newer 6 m³ ones.
Mini-mix truck capacity
About 0.4–2.4 m³, say two mini-mix firms. They suit small jobs.
Weight of a full load
About 14.4 tonnes of concrete in 6 m³. The truck itself weighs more on top.
Cost of a truck load of concrete
About $1,784 for a 6 m³ truckload, at one merchant's $297.28 per m³ with GST. With the small-order fee, $1,899.
Small loads
Allied's small-order fee is $115 with GST. We add it once to every order.

How to work it out

  1. Work out how many m³ you need. Measure in metres, then multiply length × width × thickness.
  2. Divide by what one truck holds: 6 m³ for a full truck, or 2.4 m³ for mini-mix.
  3. Round up. That is how many trucks you need.
  4. The last truck brings what is left.

8 m³ ÷ 6 m³ a truck = 1.33
Round up: 2 trucks
Last truck: 8 − 1 × 6 = 2 m³

Concrete truck capacity in NZ (m³)

NZ plants don't list their truck sizes in one place. These are the figures we could check.

  • Full-size truck, 5–6 m³: Precision Ready Mix, a Waikato plant, started with 5 m³ trucks. It had 4 more 6 m³ trucks due in 2025. A trade magazine says Allied Concrete's newer trucks have 6 m³ mixers.
  • Mini-mix truck, 0.4–2.4 m³: two mini-mix firms bring small loads this size.
  • In the US: the NRMCA, a trade group, says 8–12 cubic yards. That is about 6–9 m³.

Our calculator counts 6 m³ as the volume of a full truck. If your plant's trucks hold 5 m³, ask how it splits the order.

Trucks for common jobs

Truck loads for common jobs
JobOrder m³6 m³ trucks2.4 m³ mini-mix
Path 10 × 0.9 m, 75 mm0.811
Pad 3 × 3 m, 100 mm111
Driveway 15 × 3 m, 100 mm4.812
House slab 12 × 10 m, 100 mm12.636

With 5% extra, rounded up to 0.2 m³ (our own rule). Sizes are examples.

How much does a concrete truck load weigh?

Fresh concrete weighs about 2,400 kg per m³, says Allied Concrete. So a full 6 m³ load is about 14.4 tonnes. A 2.4 m³ mini-mix load is about 5.8 tonnes.

The truck adds its own weight. We found no NZ figure for it. The US trade group NRMCA says a loaded truck weighs about 36,000 kg. It says a loaded truck may not cross loose dirt or kerbs.

See more weights on our weight of concrete page.

Concrete truck dimensions and chute length

Mini Mix Concrete, a Christchurch firm, gives the size of its small trucks:

  • Length 6 m, width 2.4 m and height 3.2 m.
  • The chute reaches 3 m behind the truck, and 1.5 m to the side.

We found no NZ size for a full-size truck. Ask the plant if its truck fits your gate and drive.

When the chute won't reach

You can barrow the concrete, or hire a pump. MaxPump in Auckland charges at least $430 a job. It does not say if GST is in.

Allied gives 10 minutes per m³ before it may charge for waiting. So have your barrows and helpers ready.

What a concrete truck load costs

One merchant lists 20 MPa ready-mix at $297.28 per m³, with GST. It is the only list price we found, so get a quote. The listing does not say if delivery is in.

Cost and weight of a load
LoadReady-mix+ $115 feeFirth fuel surchargeWeight
0.4 m³$118.91$233.91$3.960.96 t
1 m³$297.28$412.28$9.902.4 t
2.4 m³$713.47$828.47$23.765.76 t
5 m³$1,486.40$1,601.40$49.5012 t
6 m³$1,783.68$1,898.68$59.4014.4 t

Ready-mix at $297.28 per m³ (one merchant, Oct 2026). The fee column is what our calculator shows for that order. Firth's surcharge is $9.90 per m³ from 5 Oct 2026; its GST is not stated.

  • Allied's $115 small-order fee: the order size it applies to isn't published. We add it once to every order. Set it to $0 if your plant doesn't charge it. It is with GST, and one merchant lists it.
  • Fuel: Firth calls its surcharge temporary. Ask your plant what it charges.

For bag prices and fees, see our concrete price per m³ page.

Before the truck comes

  1. Work out the m³ with our concrete calculator. Add 5% extra.
  2. Ask the plant what its trucks hold, and its smallest load.
  3. Check the truck can get close. A mini-mix chute reaches about 3 m.
  4. Have tools, barrows and helpers ready before it arrives.
  5. For a slab or drive, check your local building rules or ask a builder or engineer.

Questions people ask

How much concrete is in a concrete truck in NZ?

About 5–6 m³ in a full-size truck. Allied Concrete's newer trucks hold 6 m³. Precision Ready Mix had 6 m³ trucks due in 2025.

How many cubic metres of concrete are in a truck?

5–6 m³ in a full NZ truck, or 0.4–2.4 m³ in a mini-mix truck. In the US, trucks carry about 6–9 m³.

How much concrete does a cement truck hold?

A "cement truck" is a ready-mix concrete truck. In NZ, a full one holds about 5–6 m³.

How much does a concrete truck weigh?

Its 6 m³ load alone weighs about 14.4 tonnes. We found no NZ weight for the truck. A US trade group says a loaded truck weighs about 36 tonnes.

How much is a truck load of concrete?

A full 6 m³ load is about $1,784 at one merchant's price. A 2.4 m³ mini-mix load is about $713. Add Allied's $115 small-order fee once to each order.

What is the smallest load of concrete?

Mini-mix firms start at about 0.4 m³. We add Allied's $115 small-order fee to the order.

How long can a concrete truck wait?

Allied gives 10 minutes per m³ on site. After that, it may charge for waiting. So a 6 m³ load gets 60 minutes.